
Omega Elkraft plans high voltage lines for the distribution and regional grid. It is always necessary to undertake power line calculations when new lines are to be established. The Norwegian Water Resources and Energy Directorate (NVE) requires data such as length, diameter, pylon design, choice of materials and costs to be included in franchise applications for such installations. Fact sheet line planning.pdf